Site Waste Management Plans Now Needed for Landfill Development and Restoration Projects

Although the following topic is not directly a landfill CQA issue we thought that it would be of real interest to many of our readers. Compulsory site waste management plans (SWMPs) for construction projects over £300,000 in value, have been a legal requirement in England since April 2008, and are therefore needed for landfill works contracts. [...]

Read the rest »

The Use of a Geosynthetic Clay Liner (GCL) in Conjunction with Drainage Membranes

The use of a Geosynthetic Clay Liner (GCL) as the low permeability layer in landfill lining systems and restoration caps can provide a cost effective and readily Construction Quality Controlled alternative to natural clay. In fact this material may be the only option in regions where the local geology is such that no clay of [...]

Read the rest »

SITA Cornwall Reports Successful Landfill Works After First 12 Months

SITA Cornwall  News (January 2008) – reports: Improvement in compliance… Landfill SITA Cornwall’s two landfill sites play an important role in managing the county’s waste. A great deal of work was carried out in 2007 at the landfills and even more is planned for 2008. It was a busy year in terms of engineering at [...]

Read the rest »

Wall System Combining Sheet Piling and Geogrid Reinforcements Now Available in US

Retaining Wall System Combining Sheet Piling and Geogrid Reinforcements Now Available from Northstar Vinyl Products, LLC and Tensar International The new AquaTerraâ„¢ system combines sheet piling and geogrid reinforcements, offering considerable benefits to slope stabilization, marine and levee repair projects. Atlanta, GA (PRWEB) December 2, 2007 – Northstar Vinyl Products, LLC (http://www.northstarvinyl.com/) and Tensar International [...]

Read the rest »

Rowe Environmental Completes Penultimate Capping Stage at Killurin Landfill

This summer was the second summer season, and the 4th stage of restoration capping at this Wexford County Council landfill during which Rowe Environmental provided capping construction quality assurance services. The start of the works in June 2007 coincided with the uniqely heavy rainfall exprienced throughout the region that month. Although clay capping proceeded in between [...]

Read the rest »